Chapter 38. Hazardous Waste Permitting Process  


005. Definitions for 401 KAR Chapter 38
010. General provisions for permitting
020. Interim status provisions
025. Permit review and determination timetables
030. Conditions applicable to all permits
040. Changes to permits; expiration of permits
050. Public information procedures
060. Special types of permits
070. Application procedures
080. Contents of Part A application
090. General contents of Part B application
150. Specific Part B requirements for containers
160. Specific Part B information requirements for tanks
170. Specific Part B requirements for surface impoundments
180. Specific Part B requirements for waste piles
190. Specific Part B requirements for incinerators
200. Specific Part B requirements for land treatment facilities
210. Specific Part B requirements for landfills
230. Specific Part B requirements for miscellaneous units
240. Specific Part B requirements for process vents
250. Specific Part B requirements for equipment
260. Specific Part B information requirements for boilers and industrial furnaces burning hazardous waste
270. Specific Part B information requirements for drip pads
290. Specific Part B information requirements for air emission controls for tanks, surface impoundments, and containers
300. Specific Part B information requirements for postclosure permits
310. Permit denial
320. Remedial action plans
330. Integration with Maximum Achievable Control Technology (MACT) Standards
500. Provisions for approval by the local government or the Kentucky Regional Integrated Treatment and Disposal Facility Siting Board